Home
  General Information Product Documentation Data Issues Configuration Control Data Inventory Release Status Order Data  

Configuration Control

Key:     epoch 00     epoch 01     epoch 02     epoch 03     epoch 04  
 Example: P_R01_E02 5.0 005 -
      Production (P) data set of Release 1 (R01), Epoch 2 (E02)
      algorithm version 5.0, product version 005.
  How to use this page

Release 4 (R04)

This release incorporates several improvements for the data products primarily driven by the development of a surface clutter reduction scheme in 1B-CPR. This affects all products by improving cloud detection near the Earth's surface. In addition, the profile overlap at the beginning and end of each granule has been removed. Granules now start with the first profile on or after the equator on a descending pass and end with the last profile before the equator on the next descending pass. Release 4 also includes the first release of the 2B-GEOPROF-LIDAR product.

  Mission Time →
Processing Stream
start:2006153134223
end:2006166060000
start:2006166060000
end:2006188141402
start:2006188141402
end:2006227205631
start:2006227205631
end:not specified
1B-CPR P_R03_E00  5.3  008 P_R03_E01  5.3  008 P_R03_E02  5.3  008
MODIS-AUX P_R03_E00  5.1  007 P_R03_E01  5.1  007 P_R03_E02  5.1  007
ECMWF-AUX P_R03_E00  5.2  008 P_R03_E01  5.2  008 P_R03_E02  5.2  008
2B-GEOPROF P_R03_E00  5.3  011 P_R03_E01  5.3  011 P_R03_E02  5.3  011
2B-GEOPROF-LIDAR P_R03_E00  1.0  002 P_R03_E01  1.0  002 P_R03_E02  1.0  002

Release 3 (R03)

With the implementation of the off-nadir geolocation correction, the entire mission from 2 June to the present time can be reprocessed (R03 for the level 1B and 2B products). The two main events causing the epoch numbers to increment in the filenames remain the maneuvers to point to nadir on 7 July and to point slightly off-nadir on 15 August.

  Mission Time →
Processing Stream
start:2006153134223
end:2006166060000
start:2006166060000
end:2006188141402
start:2006188141402
end:2006227205631
start:2006227205631
end:not specified
1B-CPR P_R03_E00  5.2  007 P_R03_E01  5.2  007 P_R03_E02  5.2  007
MODIS-AUX P_R03_E00  5.1  006 P_R03_E01  5.1  006 P_R03_E02  5.1  006
ECMWF-AUX P_R03_E00  5.1  007 P_R03_E01  5.1  007 P_R03_E02  5.1  007
2B-GEOPROF P_R03_E00  5.2  010 P_R03_E01  5.2  010 P_R03_E02  5.2  010
2B-GEOPROF-LIDAR P_R03_E00  1.0  001 P_R03_E01  1.0  001 P_R03_E02  1.0  001
2B-CLDCLASS P_R03_E00  5.2  008 P_R03_E01  5.2  008 P_R03_E02  5.2  008
2B-CWC-RO P_R03_E00  5.0  007 P_R03_E01  5.0  007 P_R03_E02  5.0  007
2B-TAU P_R03_E00  5.0  007 P_R03_E01  5.0  007 P_R03_E02  5.0  007
2B-FLXHR P_R03_E00  5.0  006 P_R03_E01  5.0  006 P_R03_E02  5.0  006
Contact the DPC